SONETSEA China Floating Dock Factory Introduces How To Correctly Carry Out Water Engineering Construction

Blog Information

  • Posted By : taizhou glejin
  • Posted On : Apr 13, 2021
  • Views : 960
  • Category : Business
  • Description : China Floating Dock Factory introduces the general rules and regulations of water engineering construction:

Overview

  • China Floating Dock Factory introduces the general rules and regulations of water engineering construction:

    1. Strictly implement the ship's fuel supply and receiving regulations to prevent leakage. Oily sewage and garbage from ships shall be collected and recorded in a centralized manner. Discharge and dumping into the river is strictly prohibited, and fire-fighting equipment shall be provided.
      2. Strictly implement the "Regulations on the Navigational Safety Management of Water and Underwater Construction Operations" and the water navigation safety management regulations, operate carefully to ensure safety, and achieve "very good grasp of seven parts, leaving three points to prevent accidents." Water traffic and pollution accidents should be reported to the project department immediately.
      3. All ships must be equipped with sufficient lifebuoys, life jackets and other life-saving equipment in accordance with the regulations. Life jackets must be worn during deck operations. Safety nets should be hung up and down passages for personnel, springboards should be fixed, and standard railings should be installed around water working platforms. And safety net. At the same time, anti-freezing and anti-skid work should be done.
      4. Conscientiously implement the safety alert protection measures for the construction platform facilities, bridge piles, and underwater pipelines in the construction operation area, and shall not expand the scope of the water construction safety operation area (construction water area) without authorization to ensure the safety of people, ships and objects in the operation area.
      5. Implement the safety construction management system in the operation area to ensure that ships, rafts, and facilities not related to the construction operation are not allowed to enter the construction waters, and to prevent the occurrence of safety accidents that hinder normal construction between the construction operation ships of this project and other construction ships.
      6. Each operation team should select experienced and responsible comrades to be responsible for the safety management of water operations, and to ensure the implementation of various management systems and preventive measures for the environmental protection of personnel, ships, operating areas, and waters.
      7. Domestic garbage and plastic products on the construction vessel shall not be arbitrarily thrown into the water, and the domestic garbage must be put into a covered storage container and regularly transported to the shore for dumping.

    Through the above introduction, Pu Cheap Boxing Equipment Manufacturer hopes that you can simply refer to the content of this article in future use.